In 30+ weather (humidity was like 40) my dad went crazy starting to build the 8' x 28' Dog suite.

Day 2.  Floors and one wall is up.  Framing for new Window is up..








Day 3 - Stairs are moved.... last of the frames for walls go up and the window/screen is installed.




Tomorrow night, I have to glue down the linoleum floor and let the fumes leave the garage for at least 2 days before my dad returns to do the insulation and put up the walls and ceiling.

Then I paint!